The project originates from a fundamental tension between regulatory constraints and spatial ambition.
According to the local development plan, the site allows a building coverage of 40% with a floor area ratio of 2.5. However, when mandatory setbacks of approximately 12 meters from all sides are applied, the effective buildable zone is significantly reduced. In practice, only around 60% of the parcel remains available for construction, within which the full footprint must be organized.
This condition defines a strict inner boundary — a geometric limit within which all volumes must be positioned. Rather than treating this as a limitation, the project adopts it as a generator of form.
The urban solution originates from the maximum buildable footprint permitted by the planning regulations. Once the mandatory setbacks are applied, the effective development area becomes a clearly defined inner zone within which the entire building coverage must be accommodated.
Rather than concentrating the allowed footprint into a single mass, the buildable area is first subdivided into a series of parallel volumes whose dimensions are calibrated to accommodate efficient residential layouts with apartments oriented on both sides of a central circulation spine.
The volumes are then rotated in response to solar orientation rather than parcel geometry. This transformation allows the project to evolve from a purely quantitative planning envelope into a spatially articulated urban structure. The resulting gaps between the buildings become active open spaces, improving daylight access, reducing mutual shading, and creating a sequence of public and semi-private outdoor environments.
In this way, the project is not conceived as a fragmented building, but as a buildable area strategically organized into a system of volumes and voids where environmental performance, residential quality, and urban identity are developed simultaneously.